{"id":6844,"date":"2021-05-04T11:07:29","date_gmt":"2021-05-04T09:07:29","guid":{"rendered":"https:\/\/www.impreg.de\/referenzen\/first-cipp-liner-dn-2000-worldwide\/"},"modified":"2021-05-06T11:42:55","modified_gmt":"2021-05-06T09:42:55","slug":"first-cipp-liner-dn-2000-worldwide","status":"publish","type":"referenzen","link":"https:\/\/www.impreg.de\/en\/referenzen\/first-cipp-liner-dn-2000-worldwide\/","title":{"rendered":"First CIPP liner DN 2000 worldwide"},"content":{"rendered":"\t\t
\u00a0\u201eComing together is the beginning. Keeping together is progress. Working together is success (Henry Ford) \u2013 ProKASRO and IMPREG took this saying of the automobile pioneer to heart in mid-March 2021 in Reggio Emilia, Italy, and in turn together became pioneers in the sewer rehabilitation industry.<\/p>\n
In 2018 ProKASRO Mechatronik GmbH developed the new high-performance POWER UV system with the goal of curing liners of unprecedented size in the near future. By coupling three KASRO POWER Jumbo UV cores with an output of 3 x 6 x 2,000W and with the help of a newly designed packer for diameters of DN 1,600-2,000, the basis was already created by the equipment manufacturer ProKASRO. By increasing the standard 1,000W to 2,000W UV bulbs and the resulting maximum output of 36,000 watts, pulling speeds, especially in large diameters, and thus also the curing times, can be drastically reduced.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t Since summer 2020 the liner manufacturer IMPREG has expanded production with a correspondingly larger impregnation system up to DN2000 and developed the necessary raw materials with the various suppliers for foils and glass. In this way, IMPREG is consistently continuing the tradition of leading the way in the area of large profile rehabilitation. Nothing stood in the way of the cooperation between ProKASRO and IMPREG in order to implement the plan to install a DN 2000 liner. <\/p>\n The ready-to-install liner was picked up from the factory in Ammerbuch with a heavy-duty transporter and arrived at the construction site at the same time as the equipment, so that the installation could start immediately without any loss of time.<\/p>\n The IMPREG liner GL16 with a wall thickness of 11 millimeters (without peroxide), a total length of 164 meters and a significant weight of 22 tons was used. The IMPREG Liner GL16 with very good material characteristics and a new fiberglass design enables finely nuanced gradations of wall thicknesses. At the same time, there is a technical benefit, as the liner makes it easier to deal with larger dimensions. So perfect requirements for the DN 2000 construction site, where the team of ProKASRO and IMPREG application technicians in Italy, was deployed on March 17, 2021<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\tFurther development in large profile rehabilitation<\/h3>\n
Designed for large dimensions<\/h3>\n