{"id":6842,"date":"2021-05-04T10:07:23","date_gmt":"2021-05-04T08:07:23","guid":{"rendered":"https:\/\/www.impreg.de\/referenzen\/successful-renovation-of-large-profile-pipes-in-dortmund-germany-and-the-accompanying-challenges-big-and-small\/"},"modified":"2021-06-07T18:05:21","modified_gmt":"2021-06-07T16:05:21","slug":"successful-renovation-of-large-profile-pipes-in-dortmund-germany-and-the-accompanying-challenges-big-and-small","status":"publish","type":"referenzen","link":"https:\/\/www.impreg.de\/en\/referenzen\/successful-renovation-of-large-profile-pipes-in-dortmund-germany-and-the-accompanying-challenges-big-and-small\/","title":{"rendered":"Successful renovation of large-profile pipes in Dortmund \/ Germany and the accompanying challenges, big and small"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
SATISFIED CUSTOMERS ARE OUR SUCCESS<\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t
Successful renovation of large-profile pipes in Dortmund \/ Germany and the accompanying challenges, big and small<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\n\t\t\t\t\t\t
Nowadays, lining sewerage and drainage networks with cured-in-place pipes as specified in DIN EN ISO 11296-4 is standard practice. However, egg-shaped profiles with a cross-section of 1800 mm present a far greater challenge and call for specialist expertise. The project in Dortmund involved the trenchless lining of no fewer than four large-profile sections with a total length of approx. 285 metres, running straight through a busy residential area in the east of the city.<\/p>\n
In this case, iMPREGLiner GL16, egg-shaped profile 1200\/1800, was selected as the most suitable product for the task. Due to the material\u2019s high degree of robustness and the structural requirements the linings had to meet, wall thicknesses of between 14.6 and 17.3 mm were used.<\/strong><\/p>\n
The supervising engineering firm was S&P Consult GmbH from Bochum; during the planning phase for the rehabilitation work, they conducted a comprehensive assessment and evaluation of the brick sewers\u2019 condition in order to check their structural stability and computed the statics for the liners that were to be installed.<\/p>\n
The construction work was contracted to Swietelsky-Faber GmbH Kanalsanierung and presented the firm\u2019s Blomberg branch with several challenges to be overcome. Swietelsky-Faber GmbH Kanalsanierung is a pioneer in the field of UV-cured liners and currently operates 12 trucks equipped with the necessary UV technology in Germany. In the light of its 20 years of experience in this field, the company opted for liners from manufacturer iMPREG GmbH for this project.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\tWe at Dortmund\u2019s municipal wastewater services value certification and quality assurance guaranteed by the RAL-GZ-961 label \u2013 i.e. excellent references, the certification awarded by G\u00fcteschutz Kanalbau (The German Quality Audit Association for the Fabrication and Maintenance of Drains and Sewers \u2013 Quality Protection Sewer Construction), a wealth of experience and the reliability of both the contractor and the materials technology deployed. Dortmund also pursues a policy of sustainable investment management in terms of the proper operation and asset maintenance of the network.\t\t\t<\/p>\n\t\t\t\t\t\t\t