{"id":6832,"date":"2021-05-03T22:15:54","date_gmt":"2021-05-03T20:15:54","guid":{"rendered":"https:\/\/www.impreg.de\/referenzen\/impregliner-in-the-dunes-of-katwijk-in-the-netherlands\/"},"modified":"2021-05-06T12:37:14","modified_gmt":"2021-05-06T10:37:14","slug":"impregliner-in-the-dunes-of-katwijk-in-the-netherlands","status":"publish","type":"referenzen","link":"https:\/\/www.impreg.de\/en\/referenzen\/impregliner-in-the-dunes-of-katwijk-in-the-netherlands\/","title":{"rendered":"iMPREGLiner in the dunes of Katwijk in the Netherlands"},"content":{"rendered":"\t\t
Heavyweight liners of up to 26 tons installed successfully. <\/strong>In the dunes of Katwijk in the Netherlands, 3 pipes with lengths exceeding 600 metres required rehabilitation because of leaks. Water under enormous pressure from sea and sand had severely attacked the existing sewers and made rehabilitation necessary. This major project represented a new challenge for technology and Logistics. Good teamwork between the companies involved, NV Kumpen and iMPREG GmbH, was therefore a prerequisite. This was the only way in which the major project could be completed successfully and without problems.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t